Fitting roof windows to Redland's roofs
Redland roofs tend to be tall and steep, broken up by chimney stacks and valleys. Those features decide where a window can go, because the opening must clear them and fall between sound rafters. Rafters may need trimming and doubling up around the opening; we confirm that on site, and tell you before work is agreed what the structure will want.
Older villas and terraces have often been patched over the decades, so the covering around a proposed window can be a mixture of original and replacement material. We pick a flashing kit made for the covering actually there and judge the slope around the opening, since a smart new window set into tired roofing will not stay dry.
Many of these homes are lived in while the work goes on. We protect the room below, close the opening at the end of each day, and work out in advance how a window and its materials reach the roof on a tall house, whether by scaffold or lifting, so the household can carry on as normally as possible.
Roof window work in Redland lofts
- New window in an existing slope. We cut the opening, frame it, fit the window with its matched flashing kit and make good the covering around it.
- Replacing tired or leaking units. The old window is taken out and a new one fitted with fresh flashings, restoring a proper seal between glass and roof.
- Loft conversion lighting. For lofts being turned into rooms, we choose and position windows to suit the layout and work around the other trades on site.
- Dormer and low-pitch lofts. Dormers and shallower loft slopes need the window angle and surrounding covering considered carefully, and we plan the fitting accordingly.
- Linings, insulation and vapour control. The opening is lined and insulated with vapour control around it, giving a tidy finish and less chance of condensation.
- Misted units and leak tracing. Misting points to a failed sealed unit, while leaks usually come from flashing, sealing or the covering nearby; we work out which and fix it.
Our roof window process in Redland
First we look at the covering from outside, the rafters from inside and the room beneath, then say which flashing kit and framing the window calls for. If the structure needs strengthening, you hear about it before work is booked, along with what that involves. Each stage is explained as it comes, so nothing arrives as a surprise.
On the day we cover floors and furniture, uncover only as much roof as the window needs and make it weathertight again every evening. Then comes the lining, insulation and vapour control, and a walk-through of how the window opens, tilts and is cleaned. We leave it finished rather than nearly done.