Roof windows on Brentry's tiled semis
Roofs on Brentry's inter-war and post-war houses are tiled, and a roof window must sit in a flashing kit designed for that type of covering. We match the kit to your tiles on site, since using the wrong one is a common reason for leaks later. Tiles on these houses vary a little, so we never assume.
Many of these semis have a straightforward pitched roof with a clear slope facing the street or garden. That makes positioning easy, but rafters still have to be checked from inside, because the frame may need trimming and doubling up to carry the opening. That structural work is planned before any tiles come off, so the roof is never left weaker than it was.
If you already have an older roof window, a drip is often blamed on the glass. More often it is the flashing, the sealing or condensation, while a misted pane between the layers means the sealed unit has failed and can be replaced. Telling those apart means you do not replace a good window for no reason.
Roof window work we do in Brentry
- Installing a new roof window. Cutting the opening, framing the rafters and fitting a window with a matched flashing kit, lining and insulation.
- Replacing an old roof window. Removing a worn or leaking window and fitting a new one with fresh flashing to suit the tiles around it.
- Windows for loft conversions. Placing roof lights to give a new loft room daylight, headroom and ventilation, in line with the layout planned.
- Leak investigation and re-sealing. Finding whether a drip comes from flashing, seals, condensation or the tiles around the window, then putting it right.
- Sealed unit replacement. Replacing misted glazing where the frame and surround are still sound, rather than changing the whole window.
- Interior lining and finish. Lining the opening, insulating it and fitting a vapour control layer so the inside is neat and dry.
How we plan a roof window in Brentry
We look at the slope from outside and the rafters from the loft, checking where the window can sit and what the structure needs. We explain what trimming and doubling up of timbers is involved before we start. We also check the loft floor and insulation near the opening.
Roof window work may need planning or Building Regulations checks, and we advise before work starts. On site we open the roof, frame the opening, fit the flashing and window, and finish the inside with lining and insulation. You can see how it will look before it is done.