Roof windows on Redfield houses
On a Victorian terrace the slope is often steep and set out on regular rafters, but the exact spacing and condition vary from house to house. A roof window may need rafters trimmed and doubled up, and we check this on site instead of guessing. That check up front is what keeps the plan realistic for your roof.
The roof covering sets the flashing kit. Slate, clay or concrete tile each need a kit made for that covering, and we match the window to it. Where a rear extension or dormer is present, we look at how its roof meets the main slope before deciding where to fit. Getting it matched is what keeps rain out for the long term.
Work happens above a lived-in house in a tight yard. We protect the room below, keep the opening closed at the end of each day, and plan how to lift the window into place when rear access is limited, so disruption stays low for you and next door. Planning the lift and the protection in advance keeps disruption down.
Roof window jobs in Redfield
- New roof window in a terrace loft. We open the slope, frame the opening, fit the window with a matched flashing kit and reinstate the covering around it.
- Replacing old roof windows. Worn or leaking windows are taken out and replaced, with fresh flashings so the opening is sealed into the roof covering again.
- Loft conversion windows. For loft conversions, we fit windows to suit the planned room and the roof, working with other trades on the finish.
- Dormer and bungalow loft windows. Windows in dormers and low-pitched lofts are fitted with attention to the angle of the roof and the surrounding covering.
- Lining, insulation and vapour control. The opening is lined and insulated with vapour control around it, so the window finishes cleanly and condensation is less likely.
- Misting and leak repairs. Misted units mean a failed seal; leaks are usually flashing, sealing or covering faults. We find which it is and put it right.
How we install roof windows in Redfield
We begin by looking at the roof covering, the rafters and the room below, then explain which flashing kit and framing the window needs. If the structure needs strengthening around the opening, we tell you before work starts and show you what is involved. We tell you what happens next at each stage.
On the day we protect the room, open only the section of roof we need and close it up each evening. After fitting we finish the lining, insulation and vapour control, then show you how the window opens and cleans. Access through a small yard is agreed beforehand. Nothing is rushed.